Cabinet P1 | FTTC Available from 18th December 2015 | Phase BDUK HIE 12a | 149 | Huawei | PA37 1PY | |
Cabinet E_2 | FTTC doing Design, live due by January 2017 | Phase BDUK HIE 16a | Huawei | |||
Cabinet P2 | FTTC doing Design, live due by July 2017 | Phase BDUK HIE 16a | Huawei | |||
Cabinet E_3 | FTTC doing Design, live due by January 2017 | Phase BDUK HIE 16a | Huawei | |||
Cabinet P3 | FTTC doing Design, live due by July 2017 | Phase BDUK HIE 16a | Huawei | |||
Cabinet E_4 | FTTC doing Design, live due by January 2017 | Phase BDUK HIE 16a | Huawei | |||
Cabinet P4 | FTTC doing Design, live due by July 2017 | Phase BDUK HIE 16a | Huawei | |||
Cabinet P5 | FTTC doing Design, live due by July 2017 | Phase BDUK HIE 16a | Huawei | |||
Cabinet E_6 | FTTC doing Design, live due by January 2017 | Phase BDUK HIE 16a | Huawei |
I presume, the four "January 2017" E2/E3/E4/E6 planning applications are for the green streetside 'all-in'one' cabinets already submitted to A&B Council - namely:
Ardbhatan, Benderloch
Tyree, Benderloch
Ferlum, Benderloch,
Gair Na Mara, Barcaldine
Doing some reading, "Cabinet E_%" refers to an Exchange bundle - or a group of Exchange-Only lines (telephone lines that connect straight back the Exchange, not via a green cabinet, and hence currently can't benefit from FTTC fibre broadband).
Cabinet "P%" refers to a physical cabinet "PCP" on the street. My understanding is that an Exchange-only line can be marked for upgrade, but since there is no physical cabinet then it is referenced "E_%" until the plan for the cabinet is finalised and a "Cabinet P%" is created. It then takes sometime for the entry in the database for the E reference to be removed, so there will be one "E_%" entry and one "P%" entry for each new cabinet installed for an Exchange-only bundle. The numbering schemes for the Exchange bundles and the PCP cabinets may not necessarily match as it appears they increment the P% numbers as they are created rather than matching the corresponding Exchange bundle.
So I infer from this that the go-live date for FTTC at these new Benderloch cabinets is July 2017