It's here!

Order now complete on a Fibre broadband package Here's my connection speed:

that's 80Mbit/s download speed and 20Mbit/s upload speed on line speed,
real-world data transfer (speedtest.net anyway) gives pretty close to this:


Our line length is under 30 metres.

A neighbour with 1.3KM line length is getting 30Mb/s

Wednesday, 30 August 2017

Cabinets Accepting Orders after Openreach data glitch resolved

An issue preventing some users of cabinet 3 from ordering FTTC has been resolved. Some properties were incorrectly being reported as 'too far from the cabinet' by the Openreach tool despite being well within range of a new cabinet.

A property with a line length of approx. 1.3km from house to cabinet is able to order fibre broadband at an estimated speed of 21Mbps.

If your phone number reports as being 'too far from the cabinet' yet you are able to trace your telephone line length to be under 2km, it may be worth investigating if your line length really is too long or there is a glitch in Openreach data.

Thanks go to Highlands and Islands Enterprise for liaising with Openreach to get this resolved.

The below is based on a survey of local telephone numbers against Openreach availability checker on 21st August 2017:

https://www.homeandwork.openreach.co.uk/when-can-i-get-fibre.aspx

Cabinet 1 – in the village – has been live since Dec 2015
Cabinet 2 – Letterwalton/Pony Park/Tyree/North Benderloch - accepting orders
Cabinet 3 – South Shian opp. Shenavallie junction – accepting orders
Cabinet 4 – (opposite Ardbhatan), towards South Shian  - accepting orders
Cabinet 5 – (Barcaldine, near junction with Glen Salacah) – Not yet live. ETA November 2017

It should be noted that the usual adverts by BT/Openreach announcing the arrival of fibre have not been seen - e.g. posters on the cabinet or sales calls by BT, so even though ISPs are accepting orders, given that the cabinets are so new there may well be delays in provisioning.






Friday, 11 August 2017

Cabinet Summary - new cabinets LIVE! and new rollout dates

Cabinet 1 - in the village - has been live since Dec 2015

Cabinet 2 - Letterwalton/Pony Park/Tyree/North Benderloch IS NOW LIVE and ACCEPTING ORDERS!

Cabinet 3 - South Shian opp. Shenavallie junction - is apparently now LIVE, but not yet accepting orders. ETA Aug 2017

Cabinet 4 - (opposite Ardbhatan), towards South Shian is not yet connected for fibre and power, but new BT poles and overhead lines have been installed this week. ETA Jan 2017

Cabinet 5 - (Barcaldine, near junction with Glen Salcah) - not yet connected for fibre and power. ETA November 2017

BT availability checker shows cabinet 4 as still being connected. Cabinet 3 (Shenavallie) is activated but not yet accepting orders; presumably awaiting cabinet 4 to be wired up.



Fibre CabinetFibre StatusPhaseProperties
Passed
VendorApprox
Post Code
Cabinet P1  FTTC Available from 18th December 2015  Phase BDUK HIE 12a   149  Huawei  PA37 1PY  
Cabinet P2  FTTC being Activated, live due by August 2017  Phase BDUK HIE 16a     Huawei  PA37 1RY  
Cabinet P3  FTTC being Activated, live due by August 2017  Phase BDUK HIE 16a     Huawei  PA37 1QU  
Cabinet P4  FTTC being Connected, live due by January 2017  Phase BDUK HIE 16a     Huawei  PA37 1QR  
Cabinet P5  FTTC being Connected, live due by November 2017  Phase BDUK HIE 16a     Huawei  PA37 1SL  

Thursday, 27 July 2017

one month on and 'still within the next month'

what is the point of these predicted timescales if they are not followed?
Last check on 22 June was "within the next month"

Over one month on and...

27/07/2017
Result icon
We're performing our final quality checks and making sure everything is ready for your fibre order.
You can't order a fibre service today but typically it'll be available to your premises within the next month.
Find out more about the fibre journey.
Cabinet iconExchange name: Ledaig
Exchange status: Fibre enabled
Cabinet number: 3
Technology: -

Thursday, 22 June 2017

Availability checker - "within the next month"

22/6/17 openreach where and when:
Exchange name: Ledaig 
Exchange status: Fibre enabled 
Cabinet number: 3 
Technology: -

We're performing our final quality checks and making sure everything is ready for your fibre order.
You can't order a fibre service today but typically it'll be available to your premises within the next month.
Find out more about the fibre journey.